Issue Summary: Prelim 1 Budget and FTVP measures/attributes are showing some discrepancies
Description:

See attached for reference. The Amount Measure with the Prelim 1 Budget Financial Type attribute values differ slightly. Not sure if that is an error or not, but I would think they should be the same. Second the FTVP attribute is doing some strange things including showing some erroneous options (Prelim 1 Bud1 as opposed to Prelim 1 Budget 2023-1). The Hilton San Diego Bay front is also missing when I use the FTVP attribute filter.

Issue Status: Issue Solved
Urgency: (2) Normal
Ticket Number: CAS-388237-Z6D7Y5
Email: dwallace@hotelbisolutions.com
Created Date: November 10, 2022
Last Updated: November 17, 2023
Resolution Note:

https://extranet.actusdata.com/wp-content/uploads/formidable/67/prelim-1-budget-attribute-test.xlsx